Project Description

Play Surfacing – Thrumpton Primary Academy, Retford

Play surfacing installed at local school where there was a problem of the old wet pour play surfacing becoming slippery and a health and safety risk.

This surface was re-levelled and cleaned as required then new Needle punch play surfacing installed and fixed around the edges, it was then dressed with kiln dried sand to protect the pile of the carpet.

Full 5 year warranty on the surface